"Those who do not do their homework do not graduate."
Bryce's Law
In its simplest form, a Feasibility Study represents a definition of a
problem or opportunity to be studied, an analysis of the current mode of operation,
a definition of requirements, an evaluation of alternatives, and an agreed upon
course of action. As such, the activities for preparing a Feasibility Study are
generic in nature and can be applied to any type of project, be it for systems
and software development, making an acquisition, or any other project.
There are basically six parts to any effective Feasibility Study:
1. The Project Scope which is used to define the business problem
and/or opportunity to be addressed. The old adage, "The problem well
stated is half solved," is very apropos. The scope should be definitive
and to the point; rambling narrative serves no purpose and can actually confuse
project participants. It is also
necessary to define the parts of the business
affected either directly or indirectly, including project participants and
end-user areas affected by the project. The project sponsor should be
identified, particularly if he/she is footing the bill.
I have seen too many projects in the corporate world started without a well
defined project scope. Consequently, projects have wandered in and out of their
boundaries causing them to produce either far too much or far too little than
what is truly needed.
2. The Current Analysis is used to define and understand the current
method of implementation, such as a system, a product, etc. From this analysis,
it is not uncommon to discover there is actually nothing wrong with the current
system or product other than some misunderstandings regarding it or perhaps it
needs some simple modifications as opposed to a major overhaul. Also, the
strengths and weaknesses of the current approach are identified (pros and
cons). In addition, there may very well be elements of the current system or
product that may be used in its successor thus saving time and money later on.
Without such analysis, this may never be discovered.
Analysts are cautioned to avoid the temptation to stop and correct any
problems encountered in the current system at this time. Simply document your
findings instead, otherwise you will spend more time unnecessarily in this
stage (aka "Analysis Paralysis").
3. Requirements - how requirements are defined depends on the object
of the project's attention. For example, how requirements are specified for a
product are substantially different than requirements for an edifice, a bridge,
or an information system. Each exhibits totally different properties and, as
such, are defined differently. How you define requirements for software is also
substantially different than how you define them for systems.
4. The Approach represents the recommended solution or course of
action to satisfy the requirements. Here, various alternatives are considered
along with an explanation as to why the preferred solution was selected. In
terms of design related projects, it is here where whole rough designs (e.g.,
"renderings") are developed in order to determine viability. It is
also at this point where the use of existing structures and commercial
alternatives are considered (e.g., "build versus buy" decisions). The
overriding considerations though are:
- Does the recommended approach satisfy the requirements?
- Is it also a practical and viable solution? (Will it "Play in Poughkeepsie?")
5. Evaluation - examines the cost effectiveness of the approach selected. This begins with an analysis of the estimated total cost of the project. In addition to the recommended solution, other alternatives are estimated in order to offer an economic comparison. For development projects, an estimate of labour and out-of-pocket expenses is assembled along with a project schedule showing the project path and start-and-end dates.
After the total cost of the project has been calculated, a cost and evaluation summary is prepared which includes such things as a cost/benefit analysis, return on investment, etc.
6. Review - all of the preceding elements are then assembled into a Feasibility Study and a formal review is conducted with all parties involved. The review serves two purposes: to substantiate the thoroughness and accuracy of the Feasibility Study, and to make a project decision; either approve it, reject it, or ask that it be revised before making a final decision. If approved, it is very important that all parties sign the document which expresses their acceptance and commitment to it; it may be a seemingly small gesture, but signatures carry a lot of weight later on as the project progresses. If the Feasibility Study is rejected, the reasons for its rejection should be explained and attached to the document.
Conclusion
It should be remembered that a Feasibility Study is more of a way of thinking as opposed to a bureaucratic process. For example, what I have just described is essentially the same process we all follow when purchasing an car or a home. As the scope of the project grows, it becomes more important to document the Feasibility Study particularly if large amounts of money are involved and/or the criticality of delivery. Not only should the Feasibility Study contain sufficient detail to carry on to the next succeeding phase in the project, but it should also be used for comparative analysis when preparing the final Project Audit which analyses what was delivered versus what was proposed in the Feasibility Study.
Feasibility Studies represent a common sense approach to planning. Frankly, it is just plain good business to conduct them. However, I have read where some people in the IT field, such as the "Agile" methodology proponents, consider Feasibility Studies to be a colossal waste of time. If this is true, I've got a good used car I want to sell them.